Darell Morales  ·  Studies  ·  App concept

Site Ledger

See which claimed quantities are backed by accepted inspections.

Fictional sample · Prototype / Day 4
About the concept and the study

Inspection systems, schedules and cost systems on large programmes each hold part of the evidence used to assess progress. This fictional sample connects the schedule activity and BOQ line to scoped inspection events, then calculates the measurement sheet. Open the worked example to follow one decision and its value.

Read the study behind it: the missing join

Keep this project · local demo / Day 4

Opening local project…

Opening a project replaces this browser copy. Export first to keep your work.

What is saved?

Project files contain inspection events, reference rows, definitions, mappings and cut-off. Values are recalculated on reopen. Measurement reports are separate outputs. No field synchronisation is connected.

Find the quantity that needs a conversation ·

Compare what was planned, what passed inspection and what the contractor claimed. Where the figures disagree, identify the line the quantity surveyor needs to reconcile before a payment review.

How this works · definitions and limits

The bill of quantities (BOQ) defines the priced work. Accepted quantities are multiplied by the agreed stage weights and line rates. This is draft measurement; contract terms and an authorised reviewer still determine certification and payment.

Three truths by BOQ line

Planned (schedule)Inspected (passed WIRs)Applied by contractorApplied but not inspected

Needs a decision

Package